Loading
Loading
Saint Paul requires a permit for essentially every business sign installed in the city. Here’s the code that governs them, how the application runs through the city’s PAULIE system, and where to confirm the details — or we’ll pull it for you.
Orientation, not legal adviceSign codes change and every parcel differs. Verify current requirements with the city before relying on anything below — or let us confirm the details and pull the permit as part of your project. Last checked against sources 2026-07-19.
Chapter 64 sets what’s permitted by zoning district. Two storefronts a block apart can have different sign rights — verify the parcel’s district before finalizing a design.
The city is explicit that business signs go up under a permit. Skipping it risks a correction order and re-work — the paperwork is cheaper than the redo.
As part of a sign project we prepare the drawings and file through PAULIE, so the permit tracks with fabrication instead of stalling your opening.
From code review and shop drawings to the St. Paul filing and the finished install — one UL-listed shop handles the whole scope, so your sign clears review and goes up on schedule.