Pine Tech Campus

Overview
When Pine Technical & Community College rolled out its Minnesota State identity, the campus's new front door wasn't put in the general contractor's scope — the architect's drawings say it outright: owner to contract directly for the new monument, design-build by the sign manufacturer. That manufacturer was Dimension Sign. Under an AIA design-build contract held with the Minnesota State Board of Trustees, we engineered and built the 15-foot cedar-timber entrance monument with halo-lit letters and three-pines roundels — then a matching illuminated secondary monument and a 12½-foot run of painted aluminum building letters. A complete campus identity: designed, engineered, permitted, installed.
01 / The challenge
Design-build on a state campus means the architect's basis-of-design is a starting point and the engineering burden is yours. Our first base-plate submittal came back Revise and Resubmit from the structural engineer, with instructions to prove the foundation reaction forces. The monument had to marry 8×8 rough-cut cedar to an engineered steel connection, keep halo-lit copy alive through outstate winters — and land on footings poured by a separate sitework contractor we didn't control, cast around anchor rods set off our templates before the sign ever arrived.
02 / Our approach
We ran four knife-plate revisions in under three weeks — thickening the upright to inch-and-a-half steel per the structural engineer — until the architect stamped the detail No Exception Taken, then waterjet-cut every plate in-house and supplied plywood anchor-rod templates (and four extra knife plates) to the plaza contractor so the pours would fit the sign. The flagship carries halo-lit fabricated channel letters, 36-inch halo-lit three-pines roundels, and a laminated cedar header through-bolted with galvanized hardware — isolated from the aluminum with plastic washers so dissimilar metals never touch. Four months later the college came back for more: a matching cedar secondary monument with half-inch push-through acrylic, the legacy road sign cut off below grade, the permit pulled, footings poured and the sign set in two trips — plus the 12½-foot building letterset, stud-mounted on pattern. Both monuments wear a custom four-color spatter finish the college upgraded from the original solid black — tones drawn from the campus's freshly refreshed color palette, layered so the panels read as quarried stone from the road. The monument was the final piece of the whole campus project: when December's deep-freeze stalled the lighting corrections, we kept the college updated week by week and had the halo-lit logos rehung the first week of January so the project could close.

Carved out of the GC's scope. Engineered to pass review.
The architect's plaza drawings pulled the monument out of the general contract on purpose: this needed a design-build sign manufacturer that could carry the engineering itself. The proof came fast — our first base-plate detail was rejected by the structural engineer, and three weeks of revisions later the final knife-plate assembly, with its inch-and-a-half steel upright, was approved by both the architect and the engineer of record and built exactly as reviewed.
- The drawings, verbatim: 'Owner to contract directly for new monument sign'
- First submittal rejected; final detail approved in three weeks
- Structural engineer's 1½" upright plate, built exactly as reviewed
- Templates and extra plates supplied so another contractor's footings fit our sign
- Every steel plate waterjet-cut and welded in-house
From the shop to the campus




Scope & features
- Owner-direct AIA design-build contract with the Minnesota State system
- 15'-2" flagship monument — three 8×8 rough-cut cedar posts, laminated 2×10 header
- Halo-lit fabricated channel letters and 36" halo-lit three-pines roundels
- Steel knife-plate connections engineered through architect and structural review
- Matching illuminated secondary monument with ½" push-through acrylic
- 42"×12½' building letter composition in ¼" painted aluminum, stud-mounted on pattern
- Custom four-color spatter finish — reads as quarried stone from the road, toned to the campus palette
- Lighting corrections carried through a Minnesota deep-freeze — logos rehung the first week of January
- Anchor templates and knife plates supplied to the sitework contractor
- City permit, legacy sign removal, and a two-trip footings-then-set install
- Prevailing-wage state project, certified payroll handled in-house
Materials
- 8×8 rough-cut cedar · laminated 2×10 headers
- ¼" painted aluminum letters
- ½" push-through acrylic
- Waterjet-cut steel knife plates
- White LED halo illumination
- SW 9154 · PMS 368 · 4-color spatter finish